{"id":587,"date":"2011-09-02T21:33:16","date_gmt":"2011-09-02T21:33:16","guid":{"rendered":"http:\/\/www.sibleyfineart.com\/_blog\/?p=587"},"modified":"2011-09-02T21:52:15","modified_gmt":"2011-09-02T21:52:15","slug":"new-studio-nearing-completion","status":"publish","type":"post","link":"https:\/\/sibleyfineart.com\/_blog\/2011\/09\/new-studio-nearing-completion\/","title":{"rendered":"New Studio nearing completion!"},"content":{"rendered":"<p>I had every intention of keeping you up to date on progress but the progress took so much time there wasn&#8217;t any to spare. Sorry!  Well, today we emptied three B&#038;Qs of carpet tiles &#8211; and we had to change plans half way through due to a shortage and settled on two colours instead of one.<\/p>\n<p>Having returned from the Maidstone 3-day workshop on Monday, tomorrow the final work begins in earnest. It has to!  We&#8217;re holding our first 2-day workshop here on September 17\/18.  Incidentally, it&#8217;s fully booked, so we&#8217;re running another two weeks later on October 1\/2, and even that&#8217;s filling &#8211; just six places currently available.<\/p>\n<p><a href=\"http:\/\/www.sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/firstStrip.jpg\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/firstStrip.jpg\" alt=\"\" title=\"firstStrip\" width=\"250\" height=\"383\" class=\"alignleft size-full wp-image-591\" srcset=\"https:\/\/sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/firstStrip.jpg 250w, https:\/\/sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/firstStrip-97x150.jpg 97w\" sizes=\"auto, (max-width: 250px) 100vw, 250px\" \/><\/a><\/p>\n<div style=\"padding-top:10px;height:400px\">\nOK, back to the studio&#8230; <\/p>\n<p>The walls and ceiling are lined with plywood. I would have preferred plasterboard but the builder persuaded me that the wooden building would move and plywood would be a better choice. I&#8217;m still not convinced &#8211; especially after hours of filling and levelling all the joints. They&#8217;ll never be perfect but at least they look a lot flatter.<\/p>\n<p> That job done, the paper hanging began with heavy weight liner paper. Now, I hate papering ceilings &#8211; and this one is 20&#8242; by 22&#8242;!  There&#8217;s nothing more likely to frustrate than trying to handle a 22 foot long piece of gooey paper above your head and paste it accurately.<\/p>\n<\/div>\n<div style=\"clear:left;\">\n<a href=\"http:\/\/www.sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/halfWay.jpg\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/halfWay.jpg\" alt=\"\" title=\"halfWay\" width=\"500\" height=\"361\" class=\"aligncenter size-full wp-image-592\" srcset=\"https:\/\/sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/halfWay.jpg 500w, https:\/\/sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/halfWay-150x108.jpg 150w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/a>\n<\/div>\n<p><a href=\"http:\/\/www.sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/fullCeiling1.jpg\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/fullCeiling1.jpg\" alt=\"\" title=\"fullCeiling\" width=\"500\" height=\"412\" class=\"size-full wp-image-618\" srcset=\"https:\/\/sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/fullCeiling1.jpg 500w, https:\/\/sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/fullCeiling1-150x123.jpg 150w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/a><\/p>\n<p>I actually enjoy hanging paper &#8211; vertical paper! &#8211; and it took only three days to complete the four walls.  By then I also had the skirting boards and architraves in place and gloss painted.<\/p>\n<p><a href=\"http:\/\/www.sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/fullRoom.jpg\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/fullRoom.jpg\" alt=\"\" title=\"fullRoom\" width=\"500\" height=\"333\" class=\"aligncenter size-full wp-image-595\" srcset=\"https:\/\/sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/fullRoom.jpg 500w, https:\/\/sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/fullRoom-150x99.jpg 150w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/a><\/p>\n<p>So, what are the two donkeys doing in the centre of the room? An extra and unexpected job \ud83d\ude42 Jenny was raising funds for &#8220;Walk with Donkeys&#8221; in Crete and needed a collection box. The two donkeys have now been completed and fixed either side of a central box. <\/p>\n<figure id=\"attachment_616\" aria-describedby=\"caption-attachment-616\" style=\"width: 500px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/DonkeyBox2.jpg\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/DonkeyBox2.jpg\" alt=\"\" title=\"DonkeyBox\" width=\"500\" height=\"422\" class=\"size-full wp-image-616\" srcset=\"https:\/\/sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/DonkeyBox2.jpg 500w, https:\/\/sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/DonkeyBox2-150x126.jpg 150w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/a><figcaption id=\"caption-attachment-616\" class=\"wp-caption-text\">Donkey Charity Collection Box<\/figcaption><\/figure>\n<p>Back in the studio, the ceiling received three coats of paint and I was ably assisted by my good friend Chris Howlett, who had come up from Cambridge to help. While staying in US hotels I had noticed the wall coverings and set out to find the same in the UK. If they&#8217;re good enough to take the punishment meted out in hotel rooms, I knew they&#8217;d suit me too. I finally found a source of commercial vinyl &#8220;extra scrubbable&#8221; wallpaper in a warm off-white &#8211; and 56&#8243; wide! That really speeded the job up&#8230; until disaster struck!<\/p>\n<p>The wallpaper paste soaked through the lining paper and &#8220;blew&#8221; the plaster that was smoothing the bad joint between two of the wall boards &#8211; where it mattered on the main wall I&#8217;ve earmarked for filming DVDs. We tried a couple of fixes but eventually realised that only complete renewal would suffice.    <\/p>\n<p><a href=\"http:\/\/www.sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/badPlaster.jpg\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/badPlaster.jpg\" alt=\"\" title=\"badPlaster\" width=\"327\" height=\"525\" class=\"aligncenter size-full wp-image-597\" srcset=\"https:\/\/sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/badPlaster.jpg 327w, https:\/\/sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/badPlaster-93x150.jpg 93w, https:\/\/sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/badPlaster-311x500.jpg 311w\" sizes=\"auto, (max-width: 327px) 100vw, 327px\" \/><\/a><\/p>\n<p>Eventually, I managed to turn back the edge of the vinyl paper, removed a section of lining paper, and re-plastered the entire joint. Finally, I succeeded in inlaying a new section of lining paper and left it for two days to dry throughly. With a lot of trepidation I set about hanging the next section of wide vinyl, knowing that I only had an inch of overlap to trim to a accurate joint. I should have mentioned that this commercial paper is not butt jointed, instead it has two selvedge and you overlap adjacent sheets by 2&#8243;. Then you cut through both sheets with a knife and smooth the cut edges together. It can (honestly!) give an almost undetectable join &#8211; when it&#8217;s done by a professional \ud83d\ude42  Fortunately, the joint went well and the last wall was quickly completed. <\/p>\n<p>As if I didn&#8217;t have enough to do, Pete Hogg arrived to begin work on the nearby toilet, which is good &#8211; except that I have the door frame and door to fit and install all the electrics.  And all Pete has to do is convert a 100+ year-old former earth closet into a state-of-the-art restroom!  He&#8217;s doing an absolutely splendid job and, as I write, should have installed the hand basin and water heater, and completed the floor tiling, tomorrow.<\/p>\n<figure id=\"attachment_624\" aria-describedby=\"caption-attachment-624\" style=\"width: 550px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/loo1.jpg\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/loo1.jpg\" alt=\"\" title=\"loo\" width=\"550\" height=\"407\" class=\"size-full wp-image-624\" srcset=\"https:\/\/sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/loo1.jpg 550w, https:\/\/sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/loo1-150x110.jpg 150w, https:\/\/sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/loo1-500x370.jpg 500w\" sizes=\"auto, (max-width: 550px) 100vw, 550px\" \/><\/a><figcaption id=\"caption-attachment-624\" class=\"wp-caption-text\">Pete Hogg happily working on the 'luxury restroom'<\/figcaption><\/figure>\n<p>In the meantime, I&#8217;ve completed the electrics and installed the lighting. And I&#8217;m furiously completing the plan chest work table, painting the print rack, dresser and associated shelves, and this morning I installed the outdoor half of the HVAC air conditioning system.  The chairs have been delivered, we have one table and will order the remainder on Monday, and&#8230; it looks as though we will be ready for the inaugural workshop \ud83d\ude42 <\/p>\n<p><a href=\"http:\/\/www.sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/lights.jpg\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/lights.jpg\" alt=\"\" title=\"lights\" width=\"550\" height=\"320\" class=\"aligncenter size-full wp-image-599\" srcset=\"https:\/\/sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/lights.jpg 550w, https:\/\/sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/lights-150x87.jpg 150w, https:\/\/sibleyfineart.com\/_blog\/wp-content\/uploads\/2011\/09\/lights-500x290.jpg 500w\" sizes=\"auto, (max-width: 550px) 100vw, 550px\" \/><\/a><\/p>\n<p>Tomorrow I&#8217;ll begin work on the interior half of the air conditioning, in between adding coats of paint to the furniture.  More updates as soon as I have time&#8230; if any can be found!  <\/p>\n","protected":false},"excerpt":{"rendered":"<p>I had every intention of keeping you up to date on progress but the progress took so much time there wasn&#8217;t any to spare. Sorry!  Well, today we emptied three B&#038;Qs of carpet tiles &#8211; and we had to change plans half way through due to a shortage and settled on two colours instead of one.<\/p>\n<p>Having returned from the Maidstone 3-day workshop on Monday, the final work now begins in earnest. It has to!  We&#8217;re holding our first 2-day workshop here on this month.  Incidentally, it&#8217;s fully booked, so we&#8217;re running another on October 1\/2, and even that&#8217;s filling &#8211; just six places currently available.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[64,3],"tags":[43,160,65,6],"class_list":["post-587","post","type-post","status-publish","format-standard","hentry","category-new-studio","category-workshops","tag-drawing-course","tag-new-studio","tag-studio","tag-workshop"],"_links":{"self":[{"href":"https:\/\/sibleyfineart.com\/_blog\/wp-json\/wp\/v2\/posts\/587","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sibleyfineart.com\/_blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sibleyfineart.com\/_blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sibleyfineart.com\/_blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sibleyfineart.com\/_blog\/wp-json\/wp\/v2\/comments?post=587"}],"version-history":[{"count":31,"href":"https:\/\/sibleyfineart.com\/_blog\/wp-json\/wp\/v2\/posts\/587\/revisions"}],"predecessor-version":[{"id":630,"href":"https:\/\/sibleyfineart.com\/_blog\/wp-json\/wp\/v2\/posts\/587\/revisions\/630"}],"wp:attachment":[{"href":"https:\/\/sibleyfineart.com\/_blog\/wp-json\/wp\/v2\/media?parent=587"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sibleyfineart.com\/_blog\/wp-json\/wp\/v2\/categories?post=587"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sibleyfineart.com\/_blog\/wp-json\/wp\/v2\/tags?post=587"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}